Responsive Image Banner

Fed funding pushes construction start on Washington-Oregon bridge

Premium Content

The Interstate Bridge Replacement (IBRP) programme between the US states of Washington and Oregon received about US$1.5 billion from the US Federal Highway Administration’s Bridge Investment Program, which local media said will help kick off the first major phase of the project: replacing the Interstate Bridge.

Interstate Bridge render (Image: Interstate Bridge Replacement Program) A render of a single-level bridge, which is one of the designs considered to replace the Interstate Bridge over the Columbia River between the US states of Oregon and Washington. (Image: Interstate Bridge Replacement Program)

The IBRP said the structure will be replaced with a “new seismically resilient, multimodal solution”.

The recent grant is in addition to $600 million in funding announced by the federal government’s Department of Transportation earlier this year.

The more than $2 billion from US agencies along with $1 billion from each state puts the total raised at more than $4 billion.

The entire Interstate Bridge project is expected to cost more than $6 billion and will eventually build-out highway expansions and connections on both the Oregon and Washington sides.

With more than half the projected total allocated, pre-construction for the bridge replacement is expected to start soon. The program, however, is still in the design phase, considering four different single-level designs, one double-level scheme and a moveable steel girder concept.

Contractor and subcontractor information is not yet available, and principal construction is expected to start in 2026.

The Interstate Bridge connects the cities of Vancouver, Washington, and Portland, Oregon, with a six-lane stretch of the US Interstate 5 motorway. It’s actually two nearly identical steel vertical-lift, Parker through-truss bridges, one of which opened in 1917 and the other in 1958.

Render of US I-5 Interstate Bridge (Image: Interstate Bridge Replacement Program) A render of a movable steel girder bridge design for the Washington-Oregon Interstate Bridge replacement project. (Image: Interstate Bridge Replacement Program)
STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Why construction needs to look forward if it wants to handle uncertainty
Dr Alan Manuel, group chief executive of Currie & Brown, on why the global consultant has launched a new Certainty Index
‘European Rental Week’ puts cost control and sustainability in spotlight
As the third European Rental Week gets underway, Construction Briefing talks to leaders in Europe’s equipment rental industry about the relevance of rental in today’s construction sector.
Inside Saudi Arabia’s construction surge: three key takeaways
From Diriyah to Qiddiya, Saudi Arabia is building on an unmatched scale as Vision 2030 reshapes the kingdom’s skyline
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
Construction technology survey

Share your views and we’ll give to charity!

Take a quick survey on construction technology and we’ll donate US$3 to Habitat for Humanity for every response.

Take the Survey