Responsive Image Banner

Fluor JV lands FEED contract for historic US$40bn Canadian LNG project

A joint venture between Fluor and Japan’s JGC Corporation was awarded the front-end engineering and design (FEED) contract for the proposed second phase of an LNG export facility build in Kitimat, British Columbia, Canada.

An LNG Canada facility in Kitimat, British Columbia, Canada. Image: LNG Canada An LNG Canada facility in Kitimat, British Columbia, Canada. Image: LNG Canada

The JV, which led delivery of the facility’s recently completed first phase, will now begin detailed design work for the expansion project. During Phase 1, the JGC Fluor JV supplied engineering, procurement, fabrication, construction and commissioning services, using more than 215 prefabricated modules shipped to site to help reduce risk and cost.

The first phase of the LNG Canada project is estimated to cost around US$31 billion. An investment figure for Phase 2 was not available. The scope of works in Phase 2 could cost more than $10 billion, bringing the total project value to more than $40 billion, which is said to be the largest private infrastructure investment in Canadian history.

The project owner, energy consortia LNG Canada, said the Phase 2 FEED contract was awarded based on the joint venture’s performance during the initial build, which saw its first LNG export cargoes ship earlier this year. LNG Canada is comprised of energy and industrial firms Shell (40% stake), Petronas (25%), PetroChina (15%), Mitsubishi (15%) and KOGAS (5%).

The proposed second phase would effectively double the facility’s capacity, expanding it beyond the current 14-million tonnes-per-annum. The FEED award includes work on process units, utilities, storage tanks, shipping systems and other associated infrastructure.

With Phase 1 construction completed in June, construction could start (pending approvals) on Phase 2 as early as this year. Full completion is scheduled for 2028-29.

Venture Global makes final investment decision on $15.1 billion CP2 LNG project CP2 to deliver 28 MTPA of LNG as company hits milestone in Louisiana Gulf Coast expansion
STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
The good, the bad and the undeniable truth about… project management software
To really get on board with the digital transformation of construction, you have to know what it means – and what it might look like
Skanska calls for EU procurement reform to drive climate action
A new report from Sweden-based contractor Skanska highlights the need for procurement reform
How visual data and AI are driving smarter jobsites
Julie Pistritto, VP of Sales, Sensera Systems, on how AI can help construction create smarter, and safter, jobsites 
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA