Responsive Image Banner

Vinci consortium awarded €1.77 billion Rail Baltica contract

COBELEC Rail Baltica, a consortium comprising of VINCI subsidiary Cobra IS and Elecnor Servicios y Proyectos S.A.U, has been appointed to Rail Baltica’s electrification €1.77 billion ($2 billion) project.

Construction work on Rail Baltica's main line Photo: Rail Baltic Estonia

The consortium will carry out the design and construction of the electrification subsystem across 870 km and over 2,400 km of tracks in Estonia, Lithuania and Latvia.

The works will be implemented in two phases, Rail Baltica said. Phase one, worth €944 million ($1.1 billion), is expected to be completed in 2030.

The project will use the large-scale use of Static Frequency Converter (SFC) technology combined with 2x25 kV in a 50 Hz system, powered by ten substations. 

The consortium said: “This contract marks a major milestone in Rail Baltica’s development, and we are proud to lead Europe’s largest railway electrification project. Cobra and Elecnor have a proven track record of delivering customised, high-quality solutions.

“Drawing on our combined expertise, we have a solid history of executing complex projects to the highest standards. We are committed to supporting Rail Baltica’s strategic role in strengthening regional connectivity and EU integration.”

Marko Kivila, CEO and Chairman of the Board, RB Rail AS, added: “Electrification is not only about powering trains – it is about enabling sustainable mobility, ensuring interoperability with the European network, and securing long-term energy efficiency for the entire region.

“At the same time, this is a highly complex agreement. To ensure that every necessary step is taken and the timeline remains aligned with the overall Rail Baltica development, the electrification works will be implemented in parallel with the wider project.”

The Rail Baltica railway project is said to be the largest rail electrification project currently under way in Europe.

To date, over 100 km of railway substructure is underway in Estonia, while in March Rail Baltica Estonia signed two major construction contracts totalling up to €932 million (US$1.06 billion).

The contracts cover the full passenger mainline route through the country and formally initiating the project’s development phase.

In Latvia, large-scale construction works are underway near Iecava, while progress is being made on the 230 km framework agreement and major developments at the Riga Central Hub and Airport terminals.

Construction on the Kaunas–Panevėžys section in Lithuania is also underway, with 77 km of embankments and engineering structures ongoing.

Rail Baltica expects 43% of the mainline to be construction-ready by the end of 2025.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
The good, the bad and the undeniable truth about… project management software
To really get on board with the digital transformation of construction, you have to know what it means – and what it might look like
Skanska calls for EU procurement reform to drive climate action
A new report from Sweden-based contractor Skanska highlights the need for procurement reform
How visual data and AI are driving smarter jobsites
Julie Pistritto, VP of Sales, Sensera Systems, on how AI can help construction create smarter, and safter, jobsites 
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA