Responsive Image Banner

Holcim, Peri claim 3D-printing ‘first’ in Switzerland

Premium Content

Holcim, a global provider of building materials and aggregates, said it constructed on-site in St. Gallen, Switzerland, a 3D concrete-printed building for a client, with assistance from Peri. According to Holcim, it’s a ‘first’ for the country.

COBOD 3D concrete print (Image: COBOD) Holcim, Peri, and COBOD collaborate on this ‘first in Switzerland’ on-site 3D concrete printed building. (Image: COBOD)

The scheme was a 150m2 (1,614 sq ft) model showroom for construction and renovation firm Kobelt AG. The structure features curved concrete walls printed up to a height of 6.2m (20 ft).

The printer was a BOD2 3D construction unit from Denmark-based COBOD. Both Holcim and Peri, the German-based formwork and scaffolding manufacturer, are minority shareholders of COBOD.

About 60m3 (2,119 cu ft) of Holcim’s novel concrete mix was used, which was a departure from the mortar mix generally used across the 3D-printing segment.

Henrik Lund-Nielsen, COBOD’s founder and general manager, commented, “We congratulate Holcim on the development of the new 3D printable real concrete.

“For long we have been advocating printing with real concrete and not mortars, as the printing with mortars leads to use of more cement, higher CO2 emissions and costs.”

3D-printed showroom by Holcim and Peri (Image provided by Holcim) Renders of the showroom and, on bottom right, the materials and colour schemes used for the 3D-printed structure. (Image provided by Holcim)

The project runtime was 55 hours across eight days.

Exploring the possibilities of 3D printing

According to Holcim, Kobelt – which has experience predominantly constructing with wood – contacted the materials and aggregates group to “explore and test the possibilities of 3D printing in construction”.

Recognising the need for a showroom, but with limited space, Kobelt reached out to Holcim.

“Recognizing the novelty of the technology, Holcim Switzerland partnered with the experienced Peri 3D Construction to assist with the project,” said Holcim.

The structure was based on minimalist designs that combine wood with the concrete printed walls.

Serving as a model office space, the building contains divided zones including meeting areas, sample displays, a children’s corner, a coffee kitchen, and a separate meeting room accessed by a rounded staircase.

Lund-Nielsen noted the initiative also helped showcase the sustainability and efficiency gains of concrete-printed buildings and encouraged the segment to explore non-mortar pastes for the future.

“We need to lower the CO2 footprint of the construction sector,” he said. “This we can achieve by 3D-printing material-efficient designs with real concrete, not mortars.”

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
Seven construction technology trends for 2026
Experts say mixed-fleet data, real-time intelligence and autonomous machines will reshape project planning and field execution
Electrifying change
Can there be a pain-free approach to powering the next generation of construction equipment?
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Electrifying change

NEW ARTICLE

Off-Highway Research highlights steady progress in electrification, with market penetration at 0.8% and forecast to more than triple to over 3% by 2028. Nate Keller of Moog shares how hybrid innovation could accelerate this shift in the decade ahead.

Read now