Responsive Image Banner

Indian and US firms to build Kenya’s national electricity control centre

Nairobi City County skyline, Kenya Nairobi City County skyline, Kenya (Image: Antony Trivet, CC BY-SA 4.0, via Wikimedia Commons)

India-based construction contractor Larsen & Toubro and US-based energy equipment manufacturing firm GE Vernova have won a deal to build Kenya’s national electricity system control centre.

Kenya secured a loan from the French government last year to build the National System Control Centre (NSCC), which is expected to cost K.Sh. 12 billion (€80 million).

Work on the NSCC, which will allow the Kenya Electricity Transmission Company to monitor and manage the country’s electricity grid, will involve construction of a main control centre building in Embakasi.

Additionally, an emergency control centre building will be constructed in Suswa, featuring the same systems as the main building.

GE Vernova will lead the project through its French entity Grid Solutions SAS.

Philippe Piron, CEO of GE Vernova’s Electrification Systems businesses said, “By providing Kenya with an advanced electricity control centre, we’re aiming to enhance the reliability and efficiency of its national grid. This is a pivotal step in paving the way for a more sustainable future that supports the country’s electrification and decarbonisation goals.”

Arnaud Suquet, the French Ambassador to Kenya added, “France is committed to supporting sustainable infrastructure projects in Kenya, notably in the Power sector, as part of the broader ongoing collaboration between Kenya and France on energy transition and climate. A modern NSCC will make the Kenyan grid more resilient and reliable, enabling the integration of more variable renewable energy and ultimately providing more reliable and affordable power to Kenya’s businesses and households.”

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Building at the bottom of the world: Final season constructing an Antarctic research facility
British Antarctic Survey’s project manager David Brand on the challenges of building in Antarctica as handover of Discovery Building draws closer
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
Seven construction technology trends for 2026
Experts say mixed-fleet data, real-time intelligence and autonomous machines will reshape project planning and field execution
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA