Responsive Image Banner

Ontario awards CAN$1.4 billion contract for subway tunnel extension

Subway train in Ontario, Canada Image courtesy of Metrolinx

A consortium of construction firms has won a design‑build‑finance contract worth CAN$1.4 billion (US$1 billion) for the advance tunnelling component of the Yonge North Subway Extension.

The winning consortium, North End Connectors, comprises Aecon Infrastructure Management, Fomento de Construcciones y Contratas Canada, and Ghella Canada, with design services provided by EXP Services and Typsa.

Scope of work includes the design and construction of a 6.3‑kilometre twin‑tunnel segment extending from Toronto’s Finch Station to just south of Langstaff Road in Markham. The contract covers the supply of tunnel‑boring machines, construction of launch and extraction shafts, installation of precast concrete lining, and construction of headwalls for future stations and emergency exits.

Early works have already start, with utility relocations along the route in progress. Full tunnelling construction will begin once detailed design is finalised.

The Yonge North Subway Extension will extend TTC Line 1 service by around eight kilometres northward, and involves the construction of five new stations. The project is expected to reduce travel times between Markham and downtown Toronto by up to 22 minutes.

A new Bridge Station hub will improve connectivity, offering seamless transfers to GO Transit and local bus services.

This project is part of a broader expansion of the region’s transit infrastructure which aims to position hundreds of thousands of residents within walking distance of rapid transit.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Global construction’s carbon footprint to more than double by 2050
The global construction industry’s carbon footprint is set to more than double by 2050
Why telematics could be the most important item in your toolkit
Maximise uptime, productivity and fuel efficiency and you’re halfway to ensuring business success. And there’s a digital tool that can help…
Rethinking construction’s most overlooked role: the superintendent
With labour shortages worsening, it’s time the industry modernised how it presents one of its most vital jobs – the on-site leader who keeps projects moving
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Why telematics could be the most important item in your toolkit

NEW ARTICLE

Think telematics is just another feature that comes with the machine? Think again. Rokbak’s Graeme Blake explains how the right data can boost uptime, cut fuel costs and transform project performance.

Read now