Responsive Image Banner

Vinci drives off with three road construction contracts in Australia

A diagram of the Coomera Connector (Image courtesy of Vinci) A diagram of the Coomera Connector (Image courtesy of Vinci)

French contracting group Vinci has won three road construction contracts in Australia worth a combined €431m (A$773m).

Delivered through its local subsidiary Seymour Whyte, the projects include a major motorway extension on the Gold Coast, a flood-resilient bridge scheme in Queensland, and the upgrade of a key arterial road in western Sydney.

The largest of the three is a €229m (A$410m) contract to build a 4.4km section of the Coomera Connector between Coomera and Nerang on the Gold Coast. Awarded by the Queensland Department of Transport and Main Roads, the project includes bulk earthworks, hard rock excavation, a new interchange, and three bridges, one which will span 300m across the Nerang River.

In Queensland’s Moreton Bay region, Seymour Whyte will deliver a €48m (A$86m) upgrade to Youngs Crossing Road, including a 212m bridge over the North Pine River. The project is designed to improve flood resilience and will involve construction of retaining walls, noise barriers, and the upgraded sewer and watermains.

Meanwhile, the third project, commissioned by Transport for New South Wales, involves the design and construction of a €154m (A$277m) upgrade to the westbound carriageway of the M5 motorway in Sydney. Work includes widening 1.3km of the corridor, building a new three-lane overbridge at Moorebank Avenue, and creating a new two-lane off-ramp to the Hume Highway.

Vinci reported €1.4bn in revenue from its Australian operations in 2024, with €1.2bn generated by its construction activities. The group said the latest wins highlight its strategy to expand its presence in the country’s transport infrastructure sector.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
What machine sales tell us about the state of European construction
There are signs of a recovery – albeit a fragile one – in the European construction market
Why is LiuGong Access betting on new telehandler range for growth?
Telehandlers have never truly taken hold in China - at least, not yet.
Inside Trimble: How the Caterpillar relationship is shaping grade control
After 23 years of collaboration, Trimble’s Chris Shephard explains how the Caterpillar joint venture is evolving to boost flexibility and innovation in grade control technology
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA