Responsive Image Banner

Turkey’s ambitious canal project begins

Premium Content

Controversial €12 billion Kanal Istanbul to ease traffic congestion in Bosphorus Strait

One of the many bridges spanning the Bosphorus in Istanbul, Turkey

Turkey’s Ministry of Transport and Infrastructure has announced the start of construction work on the first of six new bridges in Istanbul, as part of an ambitious project known as Kanal Istanbul.

The highly controversial project calls for a 45km-long artificial sea-level waterway (or canal), to run parallel to the Bosphorus strait and connecting the Black Sea with the Sea of Marmara.

When completed, the canal is expected to have a capacity of 160 vessel transits a day, enough to greatly ease traffic conditions and improve safety on the congested Bosphorus.

Along with the canal and bridges, the scope of the Kanal Istanbul project includes the construction of ports, housing districts and a marina.

The entire project is expected to be completed in six years, at an estimated cost of around €12.6 billion.

The ground-breaking ceremony of the bridge to be built on the Sazlıdere Dam was attended by Turkey’s President Recep Erdoğan and the transport minister Adil Karaismailoğlu.

Karaismailoğlu stated that some 500,000 people would be employed on the project, which, he added, would contribute more than €23 billion to the country’s economy.

He said, “When Kanal Istanbul is completed, in addition to ensuring the safety of life and property of our citizens in and around the Bosphorus, as well as protecting the historical and cultural texture of the Bosphorus; It will alleviate the traffic load of the Bosphorus. According to our simulations, Kanal Istanbul will be 13 times safer than the Bosphorus in terms of navigational safety.”

Opponents of the project say it will cause ecological damage, increase the dangers posed by earthquakes and further damage Turkey’s ailing economy.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
Seven construction technology trends for 2026
Experts say mixed-fleet data, real-time intelligence and autonomous machines will reshape project planning and field execution
Electrifying change
Can there be a pain-free approach to powering the next generation of construction equipment?
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Electrifying change

NEW ARTICLE

Off-Highway Research highlights steady progress in electrification, with market penetration at 0.8% and forecast to more than triple to over 3% by 2028. Nate Keller of Moog shares how hybrid innovation could accelerate this shift in the decade ahead.

Read now