Articles by Mike Hayes

Partner Content

Electrifying change
Published on: 02 December 2025
Can there be a pain-free approach to powering the next generation of construction equipment?

Partner Content

Why telematics could be the most important item in your toolkit
Published on: 04 November 2025
Maximise uptime, productivity and fuel efficiency and you’re halfway to ensuring business success. And there’s a digital tool that can help…

Partner Content

From durability to design freedom: The rise of GRC
Published on: 08 October 2025
Why glass fibre reinforced concrete is becoming the go-to material for sustainable, resilient construction
Free webinar download: Machine tech – giving earthmoving profits a boost
Published on: 06 October 2025
Follow link to watch experts from Trimble, Off-Highway Research and the contractor GDL discuss earthmoving tech at recent industry event
Earthmoving tech webinar: panel announced for APAC-focused event
Published on: 29 September 2025
Experts will discuss how digital tech can boost profits – Thursday, October 23 at 3pm (AEST)
Earthmoving Technology Report 2025
Published on: 24 September 2025

Partner Content

The good, the bad and the undeniable truth about...
Published on: 24 September 2025
To really get on board with the digital transformation of construction, you have to know what it means – and what it might look like
Chris Sleight to kick off contech webinar with Euro market overview
Published on: 15 September 2025
Industry experts set to discuss pros and cons of advanced tech for earthmoving equipment at live September 30 event
Panel announced for KHL earthmoving technology webinar
Published on: 01 September 2025
Event on Tuesday, Sept 30 at 3pm (CET) will investigate the potential for digital technology to boost profits
Free webinar download: The pros and cons of earthmoving tech
Published on: 27 August 2025
Watch experts from Landmark Construction, Trimble and AEM speaking at recent industry event

Partner Content

Cool running: why temperature is key for equipment manufacturers
Published on: 11 August 2025
In the harsh environments of construction, quarrying and agriculture, keeping engines cool, clean and efficient can make a significant difference to the bottom line

Partner Content

Is the future of on-site power already here?
Published on: 26 June 2025
As the demand for cleaner, quieter, more convenient on-site power grows, could a new lightweight product spell the end for the humble generator?

Partner Content

Uptime, technology and other secrets to maximising earthmoving efficiency
Published on: 25 June 2025
An expert on articulated haulers, Scott Pollock describes how owners of heavy equipment can get the most out of their assets

Partner Content

Is the path clearing for electrified road construction?
Published on: 14 May 2025
An essential checklist for those looking to buy or rent small road construction equipment

Partner Content

Engineering the ultimate asphalt
Published on: 05 April 2025
How specialist pavers and compactors loaded with cutting-edge technology are taking Europe’s roads to the next level

Partner Content

A lifetime’s work – calculating the TCO of construction equipment
Published on: 03 April 2025
Dispelling myths around total cost of ownership for those considering battery-powered equipment

Partner Content

AI: A vision of future on-site safety
Published on: 03 April 2025
Algorithms can save lives. It’s a bold claim, but there are potentially significant safety benefits to using in-cab artificial intelligence

Partner Content

Tracking success: Why telematics is construction’s must-have technology
Published on: 26 March 2025
Tracking for on-site assets used to be a nice thing to have. Now telematics is a basic essential for successful construction businesses

Partner Content

Are hybrid generators the best bet for sustainable power?
Published on: 25 March 2025
With electricity grids in the US under increasing strain, the construction industry is looking to hybrid energy options to maintain consistent power and productivity.

Partner Content

Digital superhighways: How Cat MDP technology is taking soil compaction to a new level
Published on: 12 March 2025
Each element of a road construction project impacts the final result, and the importance of the base layer must not be overlooked…
Load More