Responsive Image Banner

Sweden to host world’s first carbon-neutral cement plant

Premium Content

HeidelbergCement facility will capture up to 1.8 million tonnes a year of CO2

The German multinational materials producer HeidelbergCement has announced plans to create the world’s first carbon-neutral cement plant, with an ambitious upgrading of its manufacturing facility in Slite, on the Swedish island of Gotland.

The company says it will build on the experience it gained by creating a full-scale carbon capture installation at its Brevik cement plant in Norway.

Another world first, the Norwegian facility is expected to capture approximately 50% of the carbon in its emissions by 2024, totalling around 400,000 tonnes annually.

The Swedish plant, operated by HeidelbergCement’s subsidiary Cementa, is four times the size of its Norwegian counterpart and produces around 75% of the cement used for all concrete production in Sweden.

The carbon capture facility, which will be built next to the manufacturing plant in Slite, is expected to be capturing 1.8 million tonnes of CO2 by 2030 – equivalent to the plant’s total emissions.

Additionally, Cementa will introduce biomass to the fuel mix, furthering the emissions reduction.

Dr Dominik von Achten, chairman of the Managing Board of HeidelbergCement, said, “Key for decarbonising our industry is to find, apply and scale technical solutions for carbon capture and utilisation or storage. After having gained valuable experience with CCU/S technologies in Norway and other countries, we are now excited to make the next step with a completely carbon-neutral cement plant in Sweden. This will be a game changer for our industry.”

A feasibility study for the project is underway and will address issues including the storage of the captured CO2. It is understood it will be transported to a permanent offshore storage site and placed several km down in bedrock.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
5 ways formwork and falsework are evolving
At first glance, formwork and falsework is a simple-enough concept, vital though it is for temporary works.
Global construction equipment sales are still faltering. When will they recover?
Global construction equipment sales should start to come back from the bottom of the cycle next year, according to Off-Highway Research, but there is some uncertainty around the forecast 
Why construction needs to look forward if it wants to handle uncertainty
Dr Alan Manuel, group chief executive of Currie & Brown, on why the global consultant has launched a new Certainty Index
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Inside The Minds of Leaders:
Using Tech To Unearth Greater Profit

FREE WEBINAR ON-DEMAND

This session was hosted by KHL's Mitch Keller, with speakers from AEM, Landmark Construction and Trimble.

Download and watch in your own time