Responsive Image Banner

Skanska to build £235m ‘utra-sustainable’ tower

Premium Content
105 Victoria Stree - Roof terraces 105 Victoria Street will be all-electric. (Image: DBOX for Bentall Green Oak)

Skanska UK has signed a £235m construction contract for a new 16-storey ‘ultra-sustainable’ commercial building in the centre on London, UK. 

The company, which was appointed to the project by developer Welput, said the mixed-use commercial structure located in Victoria will comprise the redevelopment of the former House of Fraser retail building, 

Known as 105 Victoria Street, the project will see the demolition of the existing retail building and the erection of a new structure with a ground, mezzanine and up to 14 storeys with terraces from the tenth floor to the fourteenth.

According to Welput - the specialist central London office fund managed by BentallGreenOak (BGO), the new 470,000sq ft (44,000m2) development will be all-electric - with its energy requirements sourced entirely from renewable sources - and will “create a new kind of community-focused” building.

Skanska’s scope of works includes the building’s construction, as well as mechanical and electrical engineering services.

The contractor will also work to deliver on the building’s energy designs, which will meet “Energy Performance Certification, EPC, A and WELL ‘Platinum’ certification and exceed The Royal Institute of British Architects (RIBA) 2030 sustainability targets.

The scheme, construction of which is expected to start in the third quarter of this year, also targets several other certifications, such as BREEAM ‘Outstanding’.

105 Victoria Street Village Square Entry The mixed-use structure will include a 'Village Square' entrance. (Image: DBOX for Bentall Green Oak)

The project will pioneer innovations in sustainability to create a healthy, green building fit for the future. It will focus on carbon reduction through attention to detail at every stage – from material selection, site operating efficiencies to modern methods of construction,” said Skanska.

Designed to “foster the health and welbeing of its end users” by architects KPF and Henning Larseninternal, the community-focused structure will feature a central ‘Village Square’ at street level and provide 30,000 sq ft of greenspace and terracing - including a 200-metre ‘walk and talk’ track and an Urban Farm with community allotments.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Liebherr LR 1300 comes of age and keeps on going
At 18 how does the 300 tonne capacity LR 1300 lattice boom crawler crane remain so popular?
Global construction equipment sales are still faltering. When will they recover?
Global construction equipment sales should start to come back from the bottom of the cycle next year, according to Off-Highway Research, but there is some uncertainty around the forecast 
Why construction needs to look forward if it wants to handle uncertainty
Dr Alan Manuel, group chief executive of Currie & Brown, on why the global consultant has launched a new Certainty Index
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Inside The Minds of Leaders:
Using Tech To Unearth Greater Profit

FREE WEBINAR ON-DEMAND

This session was hosted by KHL's Mitch Keller, with speakers from AEM, Landmark Construction and Trimble.

Download and watch in your own time