Responsive Image Banner

POWR2’s latest mobile BESS tech on display

POWR2 plans to show its latest advancements in battery energy storage systems (BESS) at Bauma 2025 in Munich, Germany, April 7 to 13.

POWR2’s POWERBANK XPro Plus battery energy storage system. (Photo: POWR2)

Among the products scheduled to be highlighted is the POWERBANK XPro Plus BESS, which the company said is designed to optimize energy use, reduce fuel consumption and deliver efficient, uninterrupted power on construction sites. The soon to be UL-listed and CSA-certified system offers an optional 30-kW DC fast charger for charging electric vehicles. Environmental control with thermal insulation supports a wide operating temperature range, while the vent-free design prevents dust infiltration, POWR2 said.

Other features include:

  • A sub-20ms transfer time between AC-coupled and standalone operation for seamless load transfer.
  • Ability to control eight individual output connections for priority load management, load scheduling and monitoring and reporting.
  • Able to run up to three units in parallel to expand power output and storage capacity to 300 kW/300 kWh.
  • Equipped with aerosol-based fire suppression, smoke detection and audible alarms for enhanced safety.
  • A galvanized, powder-coated metal frame, fully sealed and insulated and locking side doors with safety shut-off switches provide durability, while forklift pockets and lifting rings allow for easy transport.

Also featured will be the ADVANTAGE energy management system, which comes standard with every POWRBANK. The system is comprised of an energy control module (ECM) and an energy management cloud (EMC), and is designed to enable remote energy control of batteries, generators and loads, as well as comprehensive reporting of real-time insights into energy flow, fuel savings, CO2 reductions, battery performance and generator runtime.

To gain a real-world perspective of BESS application, Bauma visitors can step into an all-new virtual reality experience to witness a virtual construction site powered by the POWRBANK and see real fuel savings from users.

Hall C4, Stand 231

POWR2 introduces Advantage energy management system POWR2’s new energy management solution is engineered to optimize usage and enhance control over its POWRBANK battery energy storage system (BESS)
STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
Seven construction technology trends for 2026
Experts say mixed-fleet data, real-time intelligence and autonomous machines will reshape project planning and field execution
Electrifying change
Can there be a pain-free approach to powering the next generation of construction equipment?
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Electrifying change

NEW ARTICLE

Off-Highway Research highlights steady progress in electrification, with market penetration at 0.8% and forecast to more than triple to over 3% by 2028. Nate Keller of Moog shares how hybrid innovation could accelerate this shift in the decade ahead.

Read now