Responsive Image Banner

Foundations work begins at Saudi Arabia’s US$319 billion The Line

Premium Content
Foundation work at Saudi Arabia's The Line The Trevi Group’s subsidiary in Saudi Arabia has started the execution of the permanent foundation works for ‘The Line’

The Trevi Group’s subsidiary in Saudi Arabia has started the execution of the permanent foundation works for ‘The Line’ a futuristic and ambitious project under construction in the Tabuk area of Saudi Arabia.

Trevi Arabian Soil Contractor was the first piling contractor engaged in the piling activities at the site. The initial contract for the installation and testing of the preliminary test pile was executed between November 2021 and February 2022.

For the execution of the foundation works Trevi employs Soilmec equipment, which is an engineering division of the Trevi Group. The diameter of the piles is between 1.5-2.5m and the excavation depths are up to 70m from the work surface.

Soilmec SR-90 and SR-100 are currently present and operating on site, with plans to employ SR-115/SR-125 and SR-135 in the near future.

The workforce currently employs about 150 people but this will increase to 250 once the construction site is working at full capacity.

The Line, the first phase of which is set to cost US$319 billion, will be 170km-long, 500m tall, and run across the north west of Saudi Arabia. But the wall-like city will only be 200m-wide. The futuristic city will be home to nine million people and will consist of a series of communities laid out in a straight line, running from the Red Sea coast in the northwest of the country to the interior, crossing deserts and mountains.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Why construction needs to look forward if it wants to handle uncertainty
Dr Alan Manuel, group chief executive of Currie & Brown, on why the global consultant has launched a new Certainty Index
‘European Rental Week’ puts cost control and sustainability in spotlight
As the third European Rental Week gets underway, Construction Briefing talks to leaders in Europe’s equipment rental industry about the relevance of rental in today’s construction sector.
Inside Saudi Arabia’s construction surge: three key takeaways
From Diriyah to Qiddiya, Saudi Arabia is building on an unmatched scale as Vision 2030 reshapes the kingdom’s skyline
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
Construction technology survey

Share your views and we’ll give to charity!

Take a quick survey on construction technology and we’ll donate US$3 to Habitat for Humanity for every response.

Take the Survey