Responsive Image Banner

Images: Trevi completes foundations of Milan’s €180m Santa Giulia Arena

Premium Content

Trevi completes foundation works for the Santa Giulia Arena in Milan, Italy Trevi completes foundation works for the Santa Giulia Arena in Milan, Italy (Images supplied by Trevi Group)

Soil engineering specialist Trevi has completed the foundation works for the new €180 million Santa Giulia Arena in Milan, Italy.

The multi-purpose sports hall designed by British architect David Chipperfield and Arup, will host the men’s ice hockey competitions for the 2026 Winter Olympics in Milan and Cortina.

Trevi has carried out the work for CTS Eventim, the German ticketing and live event organisation.

Trevi completes foundation works for the Santa Giulia Arena in Milan, Italy Trevi completes foundation works for the Santa Giulia Arena in Milan, Italy (Images supplied by Trevi Group)

Trevi’s main work involved constructing 883 piles using CFA technology, 340 of which have a diameter of 1000mm and the remaining 543 a diameter of 1200mm.

The area of the new arena has soils consisting of sand and gravel with layers of silt and peat; the work surface is made about one metre above the water table.

Meanwhile, 100% of the excavated material produced by the excavation works was recovered for use in road construction and civil work fillings.

Trevi used equipment for excavation activities manufactured by the Soilmec Division of the Trevi Group and part of the Blue-tech line. The machinery has been designed to reduce consumption and CO2 emissions and contain noise pollution.

Trevi completes foundation works for the Santa Giulia Arena in Milan, Italy Trevi completes foundation works for the Santa Giulia Arena in Milan, Italy (Images supplied by Trevi Group)
STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Why telematics could be the most important item in your toolkit
Maximise uptime, productivity and fuel efficiency and you’re halfway to ensuring business success. And there’s a digital tool that can help…
Rethinking construction’s most overlooked role: the superintendent
With labour shortages worsening, it’s time the industry modernised how it presents one of its most vital jobs – the on-site leader who keeps projects moving
What is the Genie business worth and what type of buyer could it attract?
What could happen following Terex’s announcement that it will sell or spin off its Genie aerials business?
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
World Construction Week newsletter

World Construction Week & Construction Briefing

Global project news, expert analysis and market trends, straight to your inbox.

Sign me up