Responsive Image Banner

EBRD contemplates €218m loan for Uzbekistan road project

Premium Content

The European Bank for Reconstruction and Development (EBRD) is considering a request from Uzbekistan for a loan of up to €218 million to upgrade roads in the Horezm region.

Road rehabilitation has the potential to unlock economic benefits in Uzbekistan Road rehabilitation has the potential to unlock economic benefits in Uzbekistan. Photo: Adobe Stock/Evgeniy Agarkov

An upgrade of the 81km section of the road network has been identified as having potentially significant economic benefits for the region, which sits near the country’s border with Turkmenistan.

The proposed project aims boost economic growth by improving connections and reducing transportation costs between the city of Urgench and regional towns within the Horezm region.

The scope of the project encompasses a multifaceted approach to road development, including:

  • Road rehabilitation: A total of 81km of the major 4R156 regional road will undergo restoration and modernisation, as part of a larger network upgrade.
  • Bridge construction: A major feature of the project involves the construction of a bridge over the Amu Darya river.
  • Enhanced road infrastructure: The initiative involves the establishment of a new grade-separated junction and the installation of two weighing stations within the Horezm region.
  • Climate resilience: It is anticipated that the improved road infrastructure will be better equipped to withstand the effects of climate change.

As part of the post-signing technical cooperation, a strategy will be devised to develop electric vehicle (EV) charging infrastructure across Uzbekistan.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Are humanoid robots really coming to a construction work site near you?
Robots have been threatening to take over work on construction sites for the past several years and haven’t. Will they eventually?
Bentley Systems’ Nathan Marsh: why being first with AI isn’t always best
At Bentley’s Year in Infrastructure event, Nathan Marsh outlined why trust, authenticity and human oversight still matter in the AI age
From combat zones to worksites: a US Marine’s path to construction leadership
Former US Marine Kellen Concepcion on how he went from a military career to heading Semper Fi Rebar, a California subcontractor
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Why telematics could be the most important item in your toolkit

NEW ARTICLE

Think telematics is just another feature that comes with the machine? Think again. Rokbak’s Graeme Blake explains how the right data can boost uptime, cut fuel costs and transform project performance.

Read now