Responsive Image Banner

Ayesa secures contract to replace iconic Italian bridge

Premium Content

Spanish engineering services provider Ayesa has secured its first engineering contract in Italy, to develop plans for a major bridge project on the River Po.

The Casalmaggiore bridge over the River Po in the province of Parma The Casalmaggiore bridge over the River Po in the province of Parma. Photo: Ayesa

Ayesa will partner on the project with the Italian engineering firm Enser, leading the design and providing technical and economic feasibility services for a new 1,200m bridge connecting the cities of Colorno and Casalmaggiore in the Parma region.

The proposal, jointly submitted by Ayesa and Enser, was selected from 18 submissions from both local and international engineering consortiums, securing the highest score from Provincia de Parma.

The new structure will replace the Casalmaggiore Bridge, which was commissioned in 1958 and was at one time Italy’s longest bridge.

An inspection in 2017, however, exposed extensive and systematic deterioration in the deck beams, coupled with cracks on the faces of the Gerber saddles – key connections between structural elements of the bridge’s deck.

Innovative approach

The new bridge project will be executed in two phases, with construction taking place parallel to the existing bridge, minimising traffic disruptions during the demolition of the old bridge.

Marisa Chabaneix, chief markets officer for engineering at Ayesa, said, “It is a notable engineering endeavour that demands technical excellence.

“This bridge will enhance connectivity between Lombardy and Emilia-Romagna, contributing to the improved quality of life for the residents of this region.”

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Building at the bottom of the world: Final season constructing an Antarctic research facility
British Antarctic Survey’s project manager David Brand on the challenges of building in Antarctica as handover of Discovery Building draws closer
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
Seven construction technology trends for 2026
Experts say mixed-fleet data, real-time intelligence and autonomous machines will reshape project planning and field execution
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Electrifying change

NEW ARTICLE

Off-Highway Research highlights steady progress in electrification, with market penetration at 0.8% and forecast to more than triple to over 3% by 2028. Nate Keller of Moog shares how hybrid innovation could accelerate this shift in the decade ahead.

Read now