Responsive Image Banner

Contract for fourth bridge over Panama Canal awarded

Premium Content
Panama canal The main cable-stayed bridge will have a total length of 965m

Engineering and technology group Sener has been awarded the contract to design the fourth bridge over the Panama Canal.

The project covers the design and construction of a six-lane bridge that will cross the canal between Panama West and Panama City, alleviating traffic in these areas.

It is reported that the project is highly complex and that Sener’s experience of a cable-stayed bridge in Cebu, Philippines, for which the group was the lead engineering firm in the design consortium, played a role in them being awarded the contract by the Panama Cuarto Puente Consortium (CPCP).

Sener will work alongside Greisch and the Highway Planning and Design Institute (HDPI).

The main elements of the bridge include the two highly complex interchanges at either side of the canal, East (Albrook) and West (connection with the Pan-American Highway), as well as their respective double-decker access viaducts, with a total length of 2,450m, and the main cable-stayed bridge with a total length of 965m, a main span of 485m and a vertical clearance for passing ships of 75m.

The structure of the main bridge will be designed by HPDI, in collaboration with Sener and Greisch, who are responsible for their special studies and supplementary projects. Sener will also design the interchanges and access viaducts.

Ricardo Sardinha, Global Highways Business Director at Sener, said, “It’s an honor to be part of this ambitious CPCP project, which will improve the lives of Panamanians with a unique structure that poses an engineering challenge. This is a comprehensive mega-project that will require the multidisciplinary capacity that characterizes Sener.”

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
What is the Genie business worth and what type of buyer could it attract?
What could happen following Terex’s announcement that it will sell or spin off its Genie aerials business?
EU Pay Transparency Directive: what will it mean for international construction businesses?
With less than a year to go until the European Union’s (EU) Pay Transparency Directive takes effect, what does it mean for international construction businesses?
5 ways formwork and falsework are evolving
At first glance, formwork and falsework is a simple-enough concept, vital though it is for temporary works.
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Inside The Minds of Leaders:
Using Tech To Unearth Greater Profit

FREE WEBINAR ON-DEMAND

This session was hosted by KHL's Mitch Keller, with speakers from AEM, Landmark Construction and Trimble.

Download and watch in your own time