Responsive Image Banner

Zachry Group awarded EPC contract for Duke Energy’s 1,360 MW gas-fired facility

Zachry Group has been awarded the engineering, procurement and construction (EPC) contract for Duke Energy’s first Person County Combined Cycle Project, a 1,360 MW gas-fired facility planned at the existing Roxboro plant site in North Carolina, US.

A Duke Energy sign attached to a chain link fence. Image: Adobe Stock A Duke Energy sign attached to a chain link fence. Image: Adobe Stock

The two-on-one combined cycle configuration is designed to improve efficiency and reliability, supporting Duke Energy’s grid modernisation strategy and projected demand growth in the US Carolinas.

While no official cost has been disclosed, similar US combined cycle plants of this scale typically represent a multi-hundred-million-dollar investment, potentially approaching US$1 billion, depending on site, technology, and market conditions.

Zachry will deliver the project under a full EPC model, from design through commissioning and start-up, before handing over to Duke Energy for operations. To help meet labour demands, the company will host local job fairs in Person County, North Carolina to support project hiring. 

Site clearing is under way, with major construction scheduled to start in late 2025. Commercial operation is targeted for between 2028 and 2029.

Not a ‘shiny toy’ – How a contractor overhauled scheduling without chasing tech hype One US-based contractor rolled out new planning software on top of its already advanced planning system
STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
Seven construction technology trends for 2026
Experts say mixed-fleet data, real-time intelligence and autonomous machines will reshape project planning and field execution
Electrifying change
Can there be a pain-free approach to powering the next generation of construction equipment?
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Electrifying change

NEW ARTICLE

Off-Highway Research highlights steady progress in electrification, with market penetration at 0.8% and forecast to more than triple to over 3% by 2028. Nate Keller of Moog shares how hybrid innovation could accelerate this shift in the decade ahead.

Read now