Responsive Image Banner

African Development Bank approves US$696m funding for Central Corridor Network

Premium Content
The Bank’s support will enable 651 kilometers of rail to be laid between Tanzania and Burundi, promoting cross border travel and regional integration (Photo: African Development Bank Group)

The African Development Bank has approved US$696.41 million of financing for Burundi and Tanzania to build 650km of rail infrastructure to develop the Central Corridor network.

The Board of Directors of the African Development Bank Group has approved various financing structures valued at US$696.41 million for Burundi and Tanzania to start Phase II of the Joint Tanzania-Burundi-DR Congo Standard Gauge Railway (SGR) Project.

The project will be divided into three sections. The first section will run from Tabora to Kigoma, covering a distance of 411km, while the second section will cover 156km from Uvinza to Malagarasi in Tanzania. The third section will be in Burundi, spanning 84km from Malagarasi to Musongati.

The project will connect the standard gauge railway to Tanzania’s existing railway network, providing access to the Dar es Salaam port. The first phase of the project has already seen the construction of 400km of rail infrastructure in Tanzania.

The remaining section from Dodoma to Tabora is currently under construction.

The Bank Group will provide US$98.62 million to Burundi in the form of grants and US$597.79 million to Tanzania in the form of loans and guarantees.

This project is said to be a priority for not only the East African Community (EAC) Rail Master Plan, but also the African Union’s Program for Infrastructure Development in Africa (PIDA) and will facilitate economic and social transformation in both countries as well as the region.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Global construction’s carbon footprint to more than double by 2050
The global construction industry’s carbon footprint is set to more than double by 2050
Why telematics could be the most important item in your toolkit
Maximise uptime, productivity and fuel efficiency and you’re halfway to ensuring business success. And there’s a digital tool that can help…
Rethinking construction’s most overlooked role: the superintendent
With labour shortages worsening, it’s time the industry modernised how it presents one of its most vital jobs – the on-site leader who keeps projects moving
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Why telematics could be the most important item in your toolkit

NEW ARTICLE

Think telematics is just another feature that comes with the machine? Think again. Rokbak’s Graeme Blake explains how the right data can boost uptime, cut fuel costs and transform project performance.

Read now