Responsive Image Banner

Video: second dome lift at Hinkley Point C on 17 July

Flying the second Hinkley Point C reactor dome on 17 July. Video frame: EDF Energy

Sarens’ Big Carl super heavy lift ring crane was lifting the second dome into place from the early hours (UK time) on 17 July 2025 at the Hinkley Point C nuclear power station construction project.

Hinkley’s second steel reactor dome, weighs 245 tonnes. The lift was underway using the 5,000 tonne capacity SGC 250 super heavy lift ring crane nicknamed Big Carl. It is owned by Belgium-based global heavy lift and transport specialist Sarens.

The dome is 14 metres tall and now sits atop the 44 metre reactor building, having been lifted in from where it was constructed at ground level on site within reach of the giant crane. After installation the fit-out phase begins.

See the video here.

Experience gained from building the first reactor, Unit 1, saved time building Unit 2. EDF Energy, owner of the project, said, “on Unit 2’s civil construction, fewer people on site will have achieved 40 per cent more work than on Unit 1,” after the same amount of time. Assembling the polar crane that runs around a ring inside the dome to service the reactor was also 40 % faster, EDF said.

Second dome lift a few hours in on 17 July. Video frame: EDF Energy
STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Update: What do world’s biggest construction firms now spend on R&D?
The world’s largest construction companies continue to spend huge sums R&D. But how much exactly?
Project report: Robot used for power plant demolition
Sarens and Tadano carry out Dutch demolition project
Are humanoid robots really coming to a construction work site near you?
Robots have been threatening to take over work on construction sites for the past several years and haven’t. Will they eventually?
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
World Construction Week newsletter

World Construction Week & Construction Briefing

Global project news, expert analysis and market trends, straight to your inbox.

Sign me up