Responsive Image Banner

Volvo CE invests in sustainable haulers

Premium Content

Volvo Construction Equipment (Volvo CE) plans to invest in its facility in Braås, Sweden, home of its articulated haulers. The company announced its intention to invest SEK 360 million (US$32.7million) into its production facility in Braås between now and 2027, as a signal of its commitment to lead transformation toward a more sustainable construction future.

The facility in Braås specialises in the design and manufacture of articulated haulers for the global market. It produced a fossil-free construction machine that was the first in the world to be delivered to a customer – an A30G which is now in use on customer NCC’s worksite.

The investment means the factory will be adapted over the coming years to enable it to produce a larger range of articulated haulers with different types of powertrains to reflect the shift in demand towards equipment with more sustainable power sources. New buildings and production equipment – including automation and ergonomics – will extend production capacity.

Volvo CE said that pioneering manufacturing techniques is nothing new for Braås. Since producing the world’s first series manufactured articulated hauler, the 10-ton “Gravel Charlie” in 1966, the facility has been at the forefront of innovation. As well as constructing the world’s first articulated hauler made from fossil-free steel, the site was instrumental in the building of the world’s first prototype articulated hauler powered by hydrogen fuel cells – the concept Volvo HX04 – which is currently the focus of testing to develop future hydrogen solutions.

Braås is also leading the way in environmental protection and was the first in the construction industry to achieve a carbon-neutral operation powered entirely by renewable energy. In 2018, the site also became a zero-landfill facility.

“The transport and construction industry is undergoing a transformation with, among other things, an increasing number of electrified vehicles,” said Jonas Lakhall, site manager at Volvo CE in Braås. “This investment will enable us to adapt and extend our production facility so that we can offer a broader range of machines – with different powertrains – to our customers and help them meet their emission reduction ambitions.”

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
EU Pay Transparency Directive: what will it mean for international construction businesses?
With less than a year to go until the European Union’s (EU) Pay Transparency Directive takes effect, what does it mean for international construction businesses?
5 ways formwork and falsework are evolving
At first glance, formwork and falsework is a simple-enough concept, vital though it is for temporary works.
Global construction equipment sales are still faltering. When will they recover?
Global construction equipment sales should start to come back from the bottom of the cycle next year, according to Off-Highway Research, but there is some uncertainty around the forecast 
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Inside The Minds of Leaders:
Using Tech To Unearth Greater Profit

FREE WEBINAR ON-DEMAND

This session was hosted by KHL's Mitch Keller, with speakers from AEM, Landmark Construction and Trimble.

Download and watch in your own time