Vinci wins Hong Kong transit contract

23 October 2012

French contractor Vinci has been awarded a €280 million (US$ 360 million) contract to construct a 4 km long tunnel for the new Hong Kong Shatin to Central Link (SCL) mass transit line.

The contract includes the development of a 2,475 m drill and blast tunnel and 1,400 m twin tunnels to be excavated by a 7.4 m diameter slurry tunnel-boring machine.

Construction began on 22 October 2012 and is scheduled for completion in mid 2018.

The development of the new SCL line includes a 12 km underground mass transit line, four new stations and the reconfiguration of two interconnecting stations. The work is split into 10 main contracts.

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA