Responsive Image Banner

Vinci awarded two contracts in Australia

Premium Content

Seymour Whyte, an Australian subsidiary of Vinci Construction, has been awarded two new contracts in the country worth approximately AUD528 million (US$373 million) in total.

New Sydney Airport landside construction works (Photo: Vinci Construction)

In a joint venture with BMD, Seymour Whyte has been awarded a contract for landside civil and building works for the future Western Sydney International (Nancy-Bird Walton) Airport. Thsi has a scheduled opening date of 2026.

The project, worth approximately AUD 380 million (US$268 million), includes the integration of the new M12 motorway – linking the airport to the Sydney motorway network, and the airport’s two metro stations.

Over in Melbourne, Seymour Whyte has been awarded the AUD148 million (US$104 million) Healesville-Koo Wee Rup Road upgrade in the East of the city by Major Road Projects Victoria (MRPV).

The project, starting in early 2022, involves a 5km road duplication, two new bridges, and a 5.5km shared user path. The upgrade will aim to improve travel times, reduce congestion, and boost safety.

The project will minimise its environmental impact by using a 30% recycled asphalt product, reinforced concrete with recycled plastic used in place of steel reinforcing mesh and building 23 fauna underpasses.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
Seven construction technology trends for 2026
Experts say mixed-fleet data, real-time intelligence and autonomous machines will reshape project planning and field execution
Electrifying change
Can there be a pain-free approach to powering the next generation of construction equipment?
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Electrifying change

NEW ARTICLE

Off-Highway Research highlights steady progress in electrification, with market penetration at 0.8% and forecast to more than triple to over 3% by 2028. Nate Keller of Moog shares how hybrid innovation could accelerate this shift in the decade ahead.

Read now