Responsive Image Banner

US$175m California seawall project gains approval

Plans for the construction of a US$175 million seawall at San Francisco’s Ocean Beach, have been passed by the California Coastal Commission.

Ocean Beach in San Francisco, California Ocean Beach in San Francisco, California

The 3,200-foot- (975m)-long structure will protect the Lake Merced Tunnel, a significant element of the city’s storm and wastewater drainage infrastructure.

The decision to build the seawall, comes amid fears of wastewater flooding the beach, due to rising sea levels and cliff erosion.

Once completed, the seawall will be one of the largest infrastructure projects ever undertaken in California, in response to climate change.

The buried seawall project was proposed by the San Francisco Public Utilities Commission (SFPUC), and the scope of work will include the removal of rubble and temporary rock barriers from the beach, as well as the widening of the shoreline by approximately 24m.

Maintaining the seawall will involve periodic sand replenishment, at an estimated cost of $1 million per application.

The city also plans to permanently close a section of the Great Highway that runs close to the beach, integrating public trails and pedestrian access.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
US Faster Labor Contracts Act draws union support, pushback from contractor group
A developing regulation in the US is receiving mixed reviews from the construction industry
Conexpo 2026: show director on what’s new and what’s next
Dana Wuesthoff reveals to Andy Brown the highlights of ConExpo 2026 and how planning for 2029 is already well underway
What machine sales tell us about the state of European construction
There are signs of a recovery – albeit a fragile one – in the European construction market
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA