Responsive Image Banner

US$1.6 billion contract for Texas high-speed rail

Premium Content
The project will reduce journey times from Houston to Dallas from four hours to 90 minutes

The contractor Kiewit has been awarded a US$1.6 billion contract to handle core electrical systems on the Texas Central Railroad in the US.

The line between Houston and Dallas will introduce Japanese bullet train technology to the US and cut the journey time between the two cities from four hours to 90 minutes.

The contract with Kiewit and affiliate Mass Electric Construction includes the installation of core electrical systems including critical safety and systems elements like Traction power, signalling and communications equipment to enable the trains to operate safely and ensure the tracks and operators communicate properly.

The high-speed rail line – being built by Italy-based Webuild – will replicate the Japanese Tokaido Shinkansen high-speed rail system, as operated by the Central Japan Railway Company. The US$20 billion project is currently projected to be operational in 2026.

Carlos Aguilar, chief executive of the line’s developer, Texas Central, said, “Kiewit and Mass Electric are national leaders in installing complex and large-scale electric systems and have long track records of delivering high-quality rail systems safely and effectively.

“Combining their experience with the safety of an integrated system is essential to the operation of the Texas Central Railroad. Signing this contract is the next step in making the Texas Central Railroad the first high-speed rail system to be implemented in the United States.”

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
What machine sales tell us about the state of European construction
There are signs of a recovery – albeit a fragile one – in the European construction market
Why is LiuGong Access betting on new telehandler range for growth?
Telehandlers have never truly taken hold in China - at least, not yet.
Inside Trimble: How the Caterpillar relationship is shaping grade control
After 23 years of collaboration, Trimble’s Chris Shephard explains how the Caterpillar joint venture is evolving to boost flexibility and innovation in grade control technology
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA