Responsive Image Banner

The tunnels

Premium Content

11 June 2008

Length: 9.7 km of twin track railway tunnel

Seven shafts for tunnel ventilation and emergency egress

Short mined adits to the bored tunnel

TBM: Mitsubishi Earth Pressure Balance

Diameter: 9.59 m

Length of first drive: Union Square Station to Burjuman Station, 1456 m, including passing under the Creek, with about 10 to 13 m cover to Creek bed and 22 m below Creek sea level

Lining: pre-cast bolted segmental lining, 400 mm thick, with ring taper

Geology: marine sand, overlying cemented sand and Sandstones

Water table: typically 3 to 4 m below ground level

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Why construction needs to look forward if it wants to handle uncertainty
Dr Alan Manuel, group chief executive of Currie & Brown, on why the global consultant has launched a new Certainty Index
‘European Rental Week’ puts cost control and sustainability in spotlight
As the third European Rental Week gets underway, Construction Briefing talks to leaders in Europe’s equipment rental industry about the relevance of rental in today’s construction sector.
Inside Saudi Arabia’s construction surge: three key takeaways
From Diriyah to Qiddiya, Saudi Arabia is building on an unmatched scale as Vision 2030 reshapes the kingdom’s skyline
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA