Responsive Image Banner

Talks on German minimum wage for construction fail

Premium Content

The latest round of negotiations on a minimum wage structure for construction workers in Germany has failed to yield an agreement.

Photo: Adobe Images

The two main industry associations, Zentralverband Deutsches Baugewerbe (ZDB) and Hauptverband der Deutschen Bauindustrie (HDB), met with the IG BAU union at Berlin Brandenburg Airport for the third time in as many months but could not reach a consensus on the structure of a minimum wage for the industry.

The associations favour continuing with a single nationwide minimum wage strategy, while IG BAU would prefer a two-tier system, including a higher minimum wage for skilled workers.

Up to the end of last year, Minimum Wage I (€12.85) was in place for the main construction trades, with Minimum Wage II (€15.70) for skilled workers.

Following the meeting, IG BAU’s Carsten Burckhardt said the position of the associations was mystifying, given the increasing demand for skills in the country.

“It is a model that has been tried and tested for decades,” he said, “and above all protects employers who comply with the rules and pay decent wages.”

Of the meeting itself, he said, “The ‘take it or leave it’ method doesn’t work for us - negotiations work differently.”

In a press release, following the negotiations, ZDB said the amount and term of minimum wage could not be negotiated until a common understanding of the structure had been reached.

As the former minimum wage agreement expired on 31 December 2021, it is now expected that IG BAU will declare the negotiations failed and call for arbitration in the matter.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Down and changing: ICm20 crane manufacturer ranking
A decline in 2025 but perhaps smaller than might have been expected
Seven construction technology trends for 2026
Experts say mixed-fleet data, real-time intelligence and autonomous machines will reshape project planning and field execution
Electrifying change
Can there be a pain-free approach to powering the next generation of construction equipment?
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Electrifying change

NEW ARTICLE

Off-Highway Research highlights steady progress in electrification, with market penetration at 0.8% and forecast to more than triple to over 3% by 2028. Nate Keller of Moog shares how hybrid innovation could accelerate this shift in the decade ahead.

Read now