Strabag consortium wins Brenner Base Tunnel contract

27 October 2014

The Brenner Base Tunnel (Photo: Thomas Böhm / Tiroler Tageszeitung)

The Brenner Base Tunnel (Photo: Thomas Böhm / Tiroler Tageszeitung)

A consortium made up of Strabag, Salini Impregilo, Consorzio Cooperative Costruzioni CCC and Collini Lavori has been awarded a €300 million contract to build the Eisack Undercrossing section of the Brenner Base Tunnel.

Work is scheduled to begin this year with a planned construction time of around eight years.

The contract section is located at the southern end of the Brenner Base Tunnel near the town of Franzensfeste (Fortezza) in the Province of Bozen (Bolzano) in South Tyrol.

The project includes the construction of the two main tubes of the future Brenner Base Tunnel with a total length of 4.3km, as well as two connecting tunnels to the existing Brenner Railway, adaptations and improvements to the existing infrastructure, and the environmental restoration of all areas after construction is completed.

Thomas Birtel, CEO of Strabag, said, “This is an extremely demanding project from a technical point of view, as it under crosses the river Eisack, the Brenner Motorway, the state highway and the Brenner Railway with a very low rock overburden. We look forward to this challenge.”

The German contractor is the consortium lead with a 39% share.

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA