Responsive Image Banner

Skanska to rebuild ‘structurally deficient’ bridge in Columbia, NC, for $450m

The centre of the swing span on the existing Lindsay C. Warren Bridge in Columbia, NC, USA The centre of the swing span on the existing Lindsay C. Warren Bridge in Columbia, NC, USA (Image: NCDOTcommunications, CC BY 2.0, via Wikimedia Commons)

Skanska has won a US$450 million contract to rebuild the Lindsay C. Warren Bridge in Columbia, North Carolina, USA.

The project for the North Carolina Department of Transportation involves replacing the existing swing-span bridge over the Alligator River, which was built in 1960.

The new bridge will be a high-rise, fixed-span structure that will sit 4.5km (2.8 miles) north of the existing bridge.

The original bridge has been rated “structurally deficient” not because it is unsafe but because it is reaching the end of its lifecycle and has to be monitored, inspected and maintained on a more frequent basis.

Skanska said the new bridge would eliminate mechanical delays and disruptions for travellers by allowing vehicles and marine traffic to flow unimpeded.

It will feature two travel lanes, breakdown lanes on each side, clearance over the navigation channel, and safety railings.

Work is set to start this month and is expected to reach completion in April 2030.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Why construction needs to look forward if it wants to handle uncertainty
Dr Alan Manuel, group chief executive of Currie & Brown, on why the global consultant has launched a new Certainty Index
‘European Rental Week’ puts cost control and sustainability in spotlight
As the third European Rental Week gets underway, Construction Briefing talks to leaders in Europe’s equipment rental industry about the relevance of rental in today’s construction sector.
Inside Saudi Arabia’s construction surge: three key takeaways
From Diriyah to Qiddiya, Saudi Arabia is building on an unmatched scale as Vision 2030 reshapes the kingdom’s skyline
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
Construction technology survey

Share your views and we’ll give to charity!

Take a quick survey on construction technology and we’ll donate US$3 to Habitat for Humanity for every response.

Take the Survey