Responsive Image Banner

Second Lithuanian offshore wind farm a step closer

Premium Content

Lithuania has approved the environmental impact assessment (EIA) report on the nation’s second offshore wind farm.

wind farm illustration Image: Lithuanian Ministry of Energy

The project is now expected to start producing energy as early as 2028.

The approval came after assessments conducted by the EIA landscape assessment team, which concluded that the visual impact of the proposed offshore wind farm would be insignificant.

The team also approved the impact mitigation measures and actions to be undertaken by the developer during the construction and operation of the project.

The wind farm, which will be developed within 2km of the boundary of the Natura 2000 protected area, will include wind turbines projected to reach a height of 350m, which are claimed to optimise energy generation and minimise environmental impact.

EU support for renewables project

The evaluation of the EIA report also included the participation of neighbouring countries in the Baltic region. Poland, Latvia, Finland, Sweden and Denmark all contributed to the transboundary assessment of the project.

The wind farm, with a capacity of 700 MW, is set to cover an area of approximately 136.39km2 and will be situated approximately 30km from the Lithuanian coast.

The project has received a financial boost from the European Commission, which has approved a state aid scheme worth €193 million to support its development.

The selection of a developer will now be determined through a tender process, set to launch on January 15 next year, pending approval by the Lithuanian government.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
What is the Genie business worth and what type of buyer could it attract?
What could happen following Terex’s announcement that it will sell or spin off its Genie aerials business?
EU Pay Transparency Directive: what will it mean for international construction businesses?
With less than a year to go until the European Union’s (EU) Pay Transparency Directive takes effect, what does it mean for international construction businesses?
5 ways formwork and falsework are evolving
At first glance, formwork and falsework is a simple-enough concept, vital though it is for temporary works.
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Inside The Minds of Leaders:
Using Tech To Unearth Greater Profit

FREE WEBINAR ON-DEMAND

This session was hosted by KHL's Mitch Keller, with speakers from AEM, Landmark Construction and Trimble.

Download and watch in your own time