Responsive Image Banner

Russia to float nuclear plant to Arctic

Premium Content

02 July 2019

Russia floating nuclear power

Russia’s floating nuclear power station before being painted in the nation’s colours

A Russian-built floating nuclear power station is to be towed by ship this July to a remote region in the Arctic.

The power station named the Akademik Lomonsov is set to be transported from St Petersburg, across the Northern Sea, to a mineral-rich region near the port town of Pevek in the north-east of the country.

The reactor, which sits on a 144m long platform and is painted in the colours of the Russian flag, has been transported to the port of Murmansk so it can be filled with nuclear fuel.

The nuclear plant now faces a further journey of 2,951 nautical miles (5,465.3km) to its intended destination.

The power station has been under construction for nearly two decades and has been the subject of environmental controversy during that time.

Greenpeace called the platform a “floating Chernobyl”, referencing the huge nuclear disaster in the Ukraine (formerly part of the Soviet Union) during 1986.

Russia’s vision, however, is to bring the nuclear power station to settlements and companies that are extracting hydrocarbons and precious stones in the Chukotka region.

Around two million Russian residents make up the population in the area which is only accessible by plane or ship and that’s if the weather permits. Despite this the region is incredibly prosperous, generating around 20% of the country’s GDP.

The new facility is key to Russia’s economic plans to utilise the reserves of oil, gas, and other riches while Siberian reserves are diminishing.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Are humanoid robots really coming to a construction work site near you?
Robots have been threatening to take over work on construction sites for the past several years and haven’t. Will they eventually?
Bentley Systems’ Nathan Marsh: why being first with AI isn’t always best
At Bentley’s Year in Infrastructure event, Nathan Marsh outlined why trust, authenticity and human oversight still matter in the AI age
From combat zones to worksites: a US Marine’s path to construction leadership
Former US Marine Kellen Concepcion on how he went from a military career to heading Semper Fi Rebar, a California subcontractor
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Why telematics could be the most important item in your toolkit

NEW ARTICLE

Think telematics is just another feature that comes with the machine? Think again. Rokbak’s Graeme Blake explains how the right data can boost uptime, cut fuel costs and transform project performance.

Read now