Responsive Image Banner

Olympic underpass pushed through

Premium Content

06 January 2010

Skanska employed a jacked box solution with hydraullic rams to push through the underpass into the O

Skanska employed a jacked box solution with hydraullic rams to push through the underpass into the Olympic Park.

A new link to London's Olympic Park has been completed on schedule in just 28 days using a pre-constructed concrete box section, tunnelling techniques and hydraulic rams.

Contractor Skanska employed a ‘jacked box' method to push through the underpass to the Olympic Park without affecting traffic flow on the six lane carriageway of the A12 above.

The concrete box forming the underpass was constructed in three sections and measures 50 m in length. With a height of 8m and a width of 11,5 m the complete unit weighed 3500 tonnes. Tunnelling techniques were used to excavate the ground ahead of the box while a series of hydraulic rams then pushed the box into the excavated tunnel face.

Olympic Delivery Authority chairman John Armitt said, "The delivery of this critical engineering project on time is a significant achievement given the complexities and challenges involved. It is a testament to the hard work and ingenuity of our workers and engineers working round the clock to construct the new underpass beneath a busy dual carriageway, without causing any disruption to motorists."

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Are humanoid robots really coming to a construction work site near you?
Robots have been threatening to take over work on construction sites for the past several years and haven’t. Will they eventually?
Bentley Systems’ Nathan Marsh: why being first with AI isn’t always best
At Bentley’s Year in Infrastructure event, Nathan Marsh outlined why trust, authenticity and human oversight still matter in the AI age
From combat zones to worksites: a US Marine’s path to construction leadership
Former US Marine Kellen Concepcion on how he went from a military career to heading Semper Fi Rebar, a California subcontractor
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
World Construction Week newsletter

World Construction Week & Construction Briefing

Global project news, expert analysis and market trends, straight to your inbox.

Sign me up