Responsive Image Banner

New Denmark to Germany bridge

Premium Content

18 March 2008

Denmark and Germany have signed a Memorandum of Understanding that will see construction of a new € 4,2 billion bridge linking the two countries across the Baltic Sea. Known as the Fehmarn Belt Link the 20 km long bridge is expected to start construction in 2011, with completion scheduled for 2018.

A feasibility study by consultants COWI and the Danish Transport Research Institute in the early 1990s said a bridge with four traffic lanes and two rail lines would be the most viable. The study proposed two bridge designs, either a triple 724 m main span cable-stayed bridge or a 1752 m main span suspension bridge. In both cases, said the study, the concrete pylons would be about 285 m high.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
US Faster Labor Contracts Act draws union support, pushback from contractor group
A developing regulation in the US is receiving mixed reviews from the construction industry
Conexpo 2026: show director on what’s new and what’s next
Dana Wuesthoff reveals to Andy Brown the highlights of ConExpo 2026 and how planning for 2029 is already well underway
What machine sales tell us about the state of European construction
There are signs of a recovery – albeit a fragile one – in the European construction market
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA