Responsive Image Banner

New 814K wheeled dozer from Cat

Premium Content

05 June 2018

Caterpillar has launched a new 814K wheeled dozer which features a new cab, efficient power unit and transmission drive, and centralised service station configuration.

CM20171101-56660-11452

The new 814K is now available for worldwide orders

The 814K is said to be particularly suited to utility work at mines, heavy civil construction backfilling and grading work, and ground preparation and subbase work on airport and commercial projects.

The wheel dozer’s upgraded cab design features isolation cab mounting and seat air-suspension to safeguard the operator against machine vibration feedback. The quiet cabin reduces operating noise levels to just 71 dB, compared to 78 dB of its predecessor.

The dozer’s new Vital Information Management System (VIMS) allows technicians to connect directly to the machine to access a range of sensor information and data. This allows managers to create productivity reports, identify operator training opportunities, see data logging of machine parameters and diagnostic codes, and monitor machine health.

The new 814K is powered by the Cat C7.1 ACERT engine, which meets US EPA Tier 4 Final and EU Stage IV emission standards.

Offering four forward and reverse speeds to match application demands, the wheel dozer’s powershift transmission is designed specifically for the most demanding mining applications.

Two Cat blade design options offer durability and dozing and rolling characteristics. The 2.84m3 straight blade delivers high production dozing on stockpile material and general earthmoving projects. Alternatively, the 10.5m3 coal blade provides precise and productive dozing.

The Cat 814K wheel dozer is available for worldwide orders. The first machine shipments are planned for June 2018.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Are humanoid robots really coming to a construction work site near you?
Robots have been threatening to take over work on construction sites for the past several years and haven’t. Will they eventually?
Bentley Systems’ Nathan Marsh: why being first with AI isn’t always best
At Bentley’s Year in Infrastructure event, Nathan Marsh outlined why trust, authenticity and human oversight still matter in the AI age
From combat zones to worksites: a US Marine’s path to construction leadership
Former US Marine Kellen Concepcion on how he went from a military career to heading Semper Fi Rebar, a California subcontractor
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
World Construction Week newsletter

World Construction Week & Construction Briefing

Global project news, expert analysis and market trends, straight to your inbox.

Sign me up