Responsive Image Banner

Milan rail yard to become 2026 Olympic Village

Premium Content

SOM architects win competition to design site with sustainability and future use at its heart

An aerial impression of the proposed Porta Romana Olympic Village in Milan

Architect Skidmore, Owings & Merrill (SOM) has won a competition to design the village for athletes taking part in the 2026 Milan-Cortina Winter Olympics.

The Porta Romana Olympic Village will be developed by COIMA SGR and its partners on the site of the current Porta Romana railway yard in Milan.

The Olympic Village, comprising six new residential buildings and two renovated and transformed historic structures, will form part of a larger project – Parco Romana – set to include eco-zones and a suspended forest.

Of the 27 international groups competing for the Olympics contract, SOM were judged to have best satisfied the committee’s stated aim of looking beyond the 2026 event to create a sustainable urban community for the future.

SOM’s design partner Colin Koop said, “Rather than ceasing to be of use after the Olympics, the Porta Romana Olympic Village will ultimately become a vibrant, self-sustaining neighbourhood built around the principles of social equity, environmental commitment, wellness and inclusivity.”

The village will be a nearly zero energy building (NZEB), with features including passive cooling strategies, solar panels, and rooftop gardens, allowing 30% of its required energy to be produced on site. Additionally, more than 50% of the site’s drinking water will be drawn from stormwater. A reduction of some 40% of CO2 is also anticipated in terms of the heating and cooling of the buildings.

An impression of the interior of the proposed Olympic Village in Milan

The structure of the six new residential buildings of the village will be timber, while façades will be manufactured from low-embodied carbon materials.

Within the development project, two historic structures will be renovated and space will be created for food production on urban farms.

Following the Olympic games, the athletes’ living areas will become student accommodation, while the former railway side building will be used for affordable housing.

Manfredi Catella, COIMA founder & CEO, said, “The 2026 Olympic Village will represent a new urban laboratory for Milan, the first to be designed and built in its future configuration with spaces, functions, and materials already designed for their conversion, meeting NZEB principles.”

Adding that the integrated district would be managed through an evolutionary digital platform, Catella said, “The project represents our commitment to ESG [environmental & social governance] through COIMA ESG City Impact, the first Italian closed-end investment fund with measurable objectives for the country’s sustainable regeneration, which will retain the Olympic district in its portfolio following its conversion into a student residence.”

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Why construction needs to look forward if it wants to handle uncertainty
Dr Alan Manuel, group chief executive of Currie & Brown, on why the global consultant has launched a new Certainty Index
‘European Rental Week’ puts cost control and sustainability in spotlight
As the third European Rental Week gets underway, Construction Briefing talks to leaders in Europe’s equipment rental industry about the relevance of rental in today’s construction sector.
Inside Saudi Arabia’s construction surge: three key takeaways
From Diriyah to Qiddiya, Saudi Arabia is building on an unmatched scale as Vision 2030 reshapes the kingdom’s skyline
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
Construction technology survey

Share your views and we’ll give to charity!

Take a quick survey on construction technology and we’ll donate US$3 to Habitat for Humanity for every response.

Take the Survey