Responsive Image Banner

Laing O’Rourke to build €190m London high-rise

Premium Content

Laing O’Rourke has been selected to build the 19-35 Baker Street mixed use development in London, UK.

Construction is set to begin in June, with completion due in the first half of 2025.

An impression of the proposed 19-35 Baker Street development in London. Image: Derwent London

Laing O’Rourke said it has signed contracts on the project with the developer, Derwent London, with a total value of approximately €190 million.

The 10-storey scheme, designed by Hopkins Architects, has been developed with a design for manufacturer and assembly (DfMA) strategy, with a focus on increasing the efficiency of the manufacture and assembly of the building’s components.

One of the first tasks assigned to Laing O’Rourke has been to modify the design of the building, using its own carbon calculator to identify the carbon intensity of every component within the structure.

A strategy for sustainability

The company added that modern methods of construction (MMC) will be at the heart of the build and wider aspects of the project’s delivery, including cutting the length of the main works programme by 16 weeks.

An external supply chain on the project will be integrated into the construction programme, with a remit of supporting Baker Street’s MMC strategy.

Paul McNerney, director of UK building at Laing O’Rourke, said, “We are delighted to have been chosen to deliver 19-35 Baker Street, further strengthening our relationship with Derwent London.

“We have collaborated closely with the client team for the past twelve months, and by using our product set we have co-created a DfMA solution that delivers the architectural intent of the building, enhanced sustainability credentials and programme gains.

“We are excited to get started and bring to life an exciting vision and a building that supports Derwent’s sustainability strategy.”

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Rethinking construction’s most overlooked role: the superintendent
With labour shortages worsening, it’s time the industry modernised how it presents one of its most vital jobs – the on-site leader who keeps projects moving
What is the Genie business worth and what type of buyer could it attract?
What could happen following Terex’s announcement that it will sell or spin off its Genie aerials business?
EU Pay Transparency Directive: what will it mean for international construction businesses?
With less than a year to go until the European Union’s (EU) Pay Transparency Directive takes effect, what does it mean for international construction businesses?
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Inside The Minds of Leaders:
Using Tech To Unearth Greater Profit

FREE WEBINAR ON-DEMAND

This session was hosted by KHL's Mitch Keller, with speakers from AEM, Landmark Construction and Trimble.

Download and watch in your own time