Responsive Image Banner

Heidelberg accepts €161.4 million cartel penalty

Premium Content

09 April 2013

The Federal Court of Justice in Germany has upheld a 2009 district court decision to impose a penalty on HeidelbergCement for violating cartel laws between 1990 and 2002.

However, the fine of €161.4 million represented a reduction of €8.5 million from the 2009 verdict due to the excessive length of the proceedings.

The cement producer said it had accepted the verdict and expected to pay the fine in the next 12 to 18 months. It added that a charge of €30 million would be accounted for in the second quarter of 2013.

In 2009, the Higher Court in Düsseldorf cut the fines imposed on Heidelberg and four other cement producers found guilty of operating a cartel from a total of €649 million to €330 million.

The original fines, announced by the German Cartel Office in 2003, were based on assumptions about the profits made by the cartel, which also included Holcim, Lafarge, Dyckerhoff and Schwenk. However the 2009 decision said these were unsafe and could not be upheld.

The biggest fine was still imposed on HeidelbergCement, although this was cut from the original €252 million. Nevertheless, Heidelberg launched an appeal.

Heidelberg chairman Dr Bernd Scheifele said, “No current member of the managing board of HeidelbergCement was involved in the incidents, which date back more than ten years. Since then, HeidelbergCement has set up a consistent compliance programme.”

Dr Scheifele added that the company was well-prepared to avoid such violations in the future. Heidelberg’s results outlook is unchanged.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
EU Pay Transparency Directive: what will it mean for international construction businesses?
With less than a year to go until the European Union’s (EU) Pay Transparency Directive takes effect, what does it mean for international construction businesses?
5 ways formwork and falsework are evolving
At first glance, formwork and falsework is a simple-enough concept, vital though it is for temporary works.
Global construction equipment sales are still faltering. When will they recover?
Global construction equipment sales should start to come back from the bottom of the cycle next year, according to Off-Highway Research, but there is some uncertainty around the forecast 
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Inside The Minds of Leaders:
Using Tech To Unearth Greater Profit

FREE WEBINAR ON-DEMAND

This session was hosted by KHL's Mitch Keller, with speakers from AEM, Landmark Construction and Trimble.

Download and watch in your own time