Responsive Image Banner

Greek section of Trans Adriatic Pipeline completed

Premium Content

25 November 2019

TAP pipeline

Route of the under-construction Trans Adriatic Pipeline

Construction of the Greek section of the Trans Adriatic Pipeline (TAP) has been completed, according to reports in the Greek media.

The €4.5 billion undertaking – a priority project for the European Union – will see natural gas transported from Azerbaijan’s Shah Deniz 2 gas field to Greece, Italy and Albania.

The TAP pipeline connects with the Trans Anatolian Pipeline (TANAP) at the Greek-Turkish border, then runs west across the country, through Albania and across the Adriatic to connect with southern Italy.

The project was announced in 2003, but construction only began in 2016. When completed, TAP will open up the Southern Gas Corridor, which will at that point extend to 3,500km, from the Caspian Sea to Europe.

The construction of TAP requires the laying of 55,000 18m pipes, with a total weight of 520,000 tonnes, plus the excavation of an estimated 5,400 km3 of trenches excavated.

TAP shareholders include BP (20%), SOCAR (20%), Snam S.p.A. (20%), Fluxys (19%), Enagás (16%) and Axpo (5%).

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Are humanoid robots really coming to a construction work site near you?
Robots have been threatening to take over work on construction sites for the past several years and haven’t. Will they eventually?
Bentley Systems’ Nathan Marsh: why being first with AI isn’t always best
At Bentley’s Year in Infrastructure event, Nathan Marsh outlined why trust, authenticity and human oversight still matter in the AI age
From combat zones to worksites: a US Marine’s path to construction leadership
Former US Marine Kellen Concepcion on how he went from a military career to heading Semper Fi Rebar, a California subcontractor
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Why telematics could be the most important item in your toolkit

NEW ARTICLE

Think telematics is just another feature that comes with the machine? Think again. Rokbak’s Graeme Blake explains how the right data can boost uptime, cut fuel costs and transform project performance.

Read now