Responsive Image Banner

Greece’s tallest building hits major milestone

Greece’s first skyscraper and what will be the tallest building in the country when complete is said to have reached the halfway point of its construction.

Riviera Tower will be the tallest building in Greece when it is completed. Riviera Tower will be the tallest building in Greece when it is completed. Image: LAMDA Development

Riviera Tower has now seen 25 floors completed and stands at approximately 113m high. When completed it will be 200m tall. It is being built by the contractors Bouygues Batiment International and Intrakat, in a joint venture. 

Developed by LAMDA Development and designed by architectural firm, Foster + Partners, Riviera Tower will house 169 residences across 50 floors, including one- to five-bedroom apartments and penthouses, all featuring views of the Athenian Riviera.

The tower is said to be being built with sustainability in mind. According to the building’s developers, Riviera Tower achieves an 86% reduction in primary energy consumption compared to conventional buildings and is 30% more energy efficient than the average new construction in Greece, thanks to renewable energy systems, smart lighting, and automation.

Construction remains on track for completion in Q1, 2026.

The tower is part of The Ellinikon – said to be Europe’s largest urban regeneration project, located just outside Athens.

Costing a total of €8.5 billion (US$9.9 billion) and covering an area of around 6.2 million square meters the project will combine thousands of permanent residences, shopping centers, and a commercial hub, all built surrounding a 600-acre public park.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
What is the Genie business worth and what type of buyer could it attract?
What could happen following Terex’s announcement that it will sell or spin off its Genie aerials business?
EU Pay Transparency Directive: what will it mean for international construction businesses?
With less than a year to go until the European Union’s (EU) Pay Transparency Directive takes effect, what does it mean for international construction businesses?
5 ways formwork and falsework are evolving
At first glance, formwork and falsework is a simple-enough concept, vital though it is for temporary works.
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Inside The Minds of Leaders:
Using Tech To Unearth Greater Profit

FREE WEBINAR ON-DEMAND

This session was hosted by KHL's Mitch Keller, with speakers from AEM, Landmark Construction and Trimble.

Download and watch in your own time