Responsive Image Banner

Funding for 3.6km suspension bridge

Premium Content

20 March 2018

A project to build the world’s longest suspension bridge in Turkey is ready for construction after the Korean and Turkish companies who have the tender for the project succeeded in securing the level of finance required.

Turkish suspension bridge project

The bridge is due to be completed by 2023

The 1915 Çanakkale Bridge and Highway project, a suspension bridge over the Dardanelles Straits which will connect the Asian continent with Europe, has secured US$2.8 billion in financing.

The money has come from a pool of 21 lenders, including Deutsche Bank and the Bank of China.

The bridge is being built by a consortium of South Korean and Turkish companies — Daelim, SK Engineering and Construction, Limak and Yapı Merkezi — who earlier in 2017 won a tender and a 192-month lease for the project. The four companies each own a 25% stake in the project.

The suspension bridge will be 3.6km long and the project also includes the construction of 85km of connecting roads in Western Turkey.

The project has an estimated completion date of 2023, the 100-year anniversary of the founding of the Republic of Turkey. The estimated cost of the bridge is US$3.8 billion. 

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
Seven construction technology trends for 2026
Experts say mixed-fleet data, real-time intelligence and autonomous machines will reshape project planning and field execution
Electrifying change
Can there be a pain-free approach to powering the next generation of construction equipment?
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Electrifying change

NEW ARTICLE

Off-Highway Research highlights steady progress in electrification, with market penetration at 0.8% and forecast to more than triple to over 3% by 2028. Nate Keller of Moog shares how hybrid innovation could accelerate this shift in the decade ahead.

Read now