Responsive Image Banner

Funding for 3.6km suspension bridge

Premium Content

20 March 2018

A project to build the world’s longest suspension bridge in Turkey is ready for construction after the Korean and Turkish companies who have the tender for the project succeeded in securing the level of finance required.

Turkish suspension bridge project

The bridge is due to be completed by 2023

The 1915 Çanakkale Bridge and Highway project, a suspension bridge over the Dardanelles Straits which will connect the Asian continent with Europe, has secured US$2.8 billion in financing.

The money has come from a pool of 21 lenders, including Deutsche Bank and the Bank of China.

The bridge is being built by a consortium of South Korean and Turkish companies — Daelim, SK Engineering and Construction, Limak and Yapı Merkezi — who earlier in 2017 won a tender and a 192-month lease for the project. The four companies each own a 25% stake in the project.

The suspension bridge will be 3.6km long and the project also includes the construction of 85km of connecting roads in Western Turkey.

The project has an estimated completion date of 2023, the 100-year anniversary of the founding of the Republic of Turkey. The estimated cost of the bridge is US$3.8 billion. 

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Liebherr LR 1300 comes of age and keeps on going
At 18 how does the 300 tonne capacity LR 1300 lattice boom crawler crane remain so popular?
Global construction equipment sales are still faltering. When will they recover?
Global construction equipment sales should start to come back from the bottom of the cycle next year, according to Off-Highway Research, but there is some uncertainty around the forecast 
Why construction needs to look forward if it wants to handle uncertainty
Dr Alan Manuel, group chief executive of Currie & Brown, on why the global consultant has launched a new Certainty Index
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Inside The Minds of Leaders:
Using Tech To Unearth Greater Profit

FREE WEBINAR ON-DEMAND

This session was hosted by KHL's Mitch Keller, with speakers from AEM, Landmark Construction and Trimble.

Download and watch in your own time