Final Panama Canal contract awarded

30 December 2009

A consortium of Spain's FCC, Mexico's ICA and Costa Rica's Meco has won the final Panama Canal dry-excavation contract with a US$ 267.8 million bid. The consortium beat Belgium's Jan de Nul, Brazil's Oderbrecht and the ISC Panama consortium to win the contract, the second largest in the US$ 5.25 billion canal expansion programme.

The contract involves the excavation of a new channel that will link a new set of locks - yet to be constructed - with the Gaillard Cut, the canal's narrowest stretch. The bid represents the last contract on the canal expansion and will involve the excavation and removal of 27 million m3 of material.

The contract will entail the opening of a 6.1 km access channel as well as the construction of a large earth and rock dam with a watertight clay core.

Panama Canal Authority (PCA) administrator Alberto Aleman Zubieta said, "The excavation project should be finished by 2013, with the entire canal expansion due for completion in 2014."

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA