Responsive Image Banner

Ferrovial to acquire solar photovoltaic projects in Spain

Premium Content

Ferrovial, through its Energy Infrastructure and Mobility division, has reached an agreement with a major developer group to acquire two solar photovoltaic projects in Andalusia, Spain.

Solar photovoltaic farm The two plants will employ between 250 and 300 skilled workers in the construction phase (Photo: Ferrovial)

The two projects, with a total installed capacity of approximately 100 MWp, are in addition to the company’s existing projects in the region. The plants will be able to supply more than 60,000 households and avoid the emission of 33,600 metric tons of CO2.

In addition to this, the project will employ 250 to 300 skilled workers in the construction phase.

The projects are expected to commence between the second and third quarter of this year and are projected to become operational in the second half of 2024

The two projects will comprise 154,000 bifacial photovoltaic modules on single-axis trackers. The location receives a high level of solar radiation, which means that they will be able to inject an estimated 210 GWh/year of electricity into the grid, equivalent to the electricity used by approximately 60,000 homes. They will also contribute to reducing CO₂ emissions by over 33,600 tons per year.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
What is the Genie business worth and what type of buyer could it attract?
What could happen following Terex’s announcement that it will sell or spin off its Genie aerials business?
EU Pay Transparency Directive: what will it mean for international construction businesses?
With less than a year to go until the European Union’s (EU) Pay Transparency Directive takes effect, what does it mean for international construction businesses?
5 ways formwork and falsework are evolving
At first glance, formwork and falsework is a simple-enough concept, vital though it is for temporary works.
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Inside The Minds of Leaders:
Using Tech To Unearth Greater Profit

FREE WEBINAR ON-DEMAND

This session was hosted by KHL's Mitch Keller, with speakers from AEM, Landmark Construction and Trimble.

Download and watch in your own time