Responsive Image Banner

Dubai’s Al Khail bridge set to open

Premium Content

11 December 2017

Dubai bridge

The new bridge in Dubai will open in January 2018

The bridge extending from Al Khail Road to the Financial Centre Road in Dubai, UAE, constructed in collaboration with Emaar Properties, will be opened early January 2018, according to the chief of the Roads and Transport Authority (RTA).

The contractor is currently putting the final touches on the project in preparation for opening, explained Mattar Al Tayer Al Tayer, RTA’s director-general and chairman.

“The project encompasses the construction of a two-lane one-way bridge extending 1.27km built on single columns crossing over the Dubai Water Canal. The project works include lighting and infrastructure works such as the shifting the impacted utility services like water, electricity, irrigation, sewage and telecommunication lines,” said Al Tayer Al Tayer.

The bridge, which starts from the intersection of Ras Al Khor Road-Al Khail Road, encompasses adding two lanes extending 0.5km to the existing road to enable direct flow of traffic from Dubai-Al Ain Road to Al Khail Road via the upper deck of the Financial Centre Road. Works include providing an entry point for the parking terminal of the extension of Dubai Mall.

The project will ease the flow of traffic along the Financial Centre Road and surface intersections, thus easing the pressure on the intersections of Mohammed bin Rashid Boulevards. It will raise the capacity of the road to 45,00 vehicles per hour during peaking hours, serve several development projects and ease the pressure on the existing roads network.

The construction of the bridge is intended to accommodate the massive expansion of Dubai Mall undertaken by Emaar Properties rendering it the largest shopping and entertainment destination in the world capable of receiving more than 100 million visitors per annum.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
CICA president: Why better permitting, collaboration, and financing are key to solving global construction’s biggest issues
Regardless of where they are based, there are certain challenges that are common to construction companies all over the world
Building at the bottom of the world: Final season constructing an Antarctic research facility
British Antarctic Survey’s project manager David Brand on the challenges of building in Antarctica as handover of Discovery Building draws closer
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Discover what 138 construction professionals say about the future of earthmoving.

FREE REPORT

Essential reading for contractors planning their next phase of technology adoption.

Download for free