Responsive Image Banner

Dubai plans city from scratch

Premium Content

19 March 2008

Waterfront City

Waterfront City

Netherlands-based Office for Metropolitan Architecture (OMA) has unveiled images for its masterplan of Waterfront City, Dubai for developer Nakheel.

The masterplan comprises a central, square island surrounded by four neighbouring districts - the Boulevard, Madinat Al Soor, the Resort and the Marina. Built "from scratch" it forms the centre of the 14 million m2 Waterfront, Dubai's largest development to date.

The central Island district is the "defining element" of the project, according to an OMA spokesman. Surrounded by water on all sides it will cover 7 million m2.

Based on a grid of five streets by five streets it is designed to create a "city on a human scale" by ensuring traffic passes through the city easily, while creating "walkable distances" between blocks, said the company.

Environmental considerations also inform OMA's design, with shading and climate control being provided by the clustering of its towers on the south side. This should also make efficient use of wind flows for cooling, while further protection from the sun comes from each block's tree lined arcades.

The island will be connected to the mainland via a "comprehensive" public transport system, which will include Dubai's new metro system. There will also be direct links to Al Maktoum International Airport, which is currently under construction and set to become Dubai's main airport hub.

When complete the area is expected to have a residential population of 92000 and a working population of 310000 people.

The Waterfront will provide homes for about 1.5 million new people, effectively doubling Dubai's population and creating one million jobs. Located on Dubai's western border, it occupies a "prime position" between Dubai and neighbouring Abu Dhabi.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Project report: Robot used for power plant demolition
Sarens and Tadano carry out Dutch demolition project
Are humanoid robots really coming to a construction work site near you?
Robots have been threatening to take over work on construction sites for the past several years and haven’t. Will they eventually?
Bentley Systems’ Nathan Marsh: why being first with AI isn’t always best
At Bentley’s Year in Infrastructure event, Nathan Marsh outlined why trust, authenticity and human oversight still matter in the AI age
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
World Construction Week newsletter

World Construction Week & Construction Briefing

Global project news, expert analysis and market trends, straight to your inbox.

Sign me up