Responsive Image Banner

Covid Survey by CECE, ERA and Lectura

Premium Content

23 September 2020

The Covid-19 pandemic hit the heavy machinery industry hard and fast. Many companies had to adapt to the challenging situation and regulations set by local authorities, which led to significant restrictions. A majority of manufacturers, dealers and rental companies were forced to operate under limited conditions.

Survey Lectura CECE ERA

It is important to emphasise that the effects of the Covid-19 pandemic have not been equal and the conditions for business differed from country to country. This is the reason why Lectura asked their website visitors to give their opinion on the outcomes of the crisis in connection with their businesses.

Lectura recently ran an online survey in cooperation with the European Rental Association (ERA) and the Committee for European Construction Equipment (CECE), focused on the aftermath of the crisis.

The aim of the research was to explore how the Covid-19 crisis affected various sectors. The survey primarily targeted international contractors, dealers, rental companies and machine owners, and further questioned them about the impact of Covid-19 and following restrictions on their businesses.

The survey included questions about changing business strategies, plans for the future, and who the respondents expect support from, as well as much more.

The result of this survey is now available online.

If you wish to have more information about this survey or about the ERA, please contact the ERA team at [email protected].

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
CICA president: Why better permitting, collaboration, and financing are key to solving global construction’s biggest issues
Regardless of where they are based, there are certain challenges that are common to construction companies all over the world
Building at the bottom of the world: Final season constructing an Antarctic research facility
British Antarctic Survey’s project manager David Brand on the challenges of building in Antarctica as handover of Discovery Building draws closer
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Discover what 138 construction professionals say about the future of earthmoving.

FREE REPORT

Essential reading for contractors planning their next phase of technology adoption.

Download for free