Responsive Image Banner

Construction starts on Datong Art Museum

Premium Content

26 April 2012

Foster + Partners design for the under-construction Datong Art Museum in Datong, Shanxi Province, Ch

Foster + Partners design for the under-construction Datong Art Museum in Datong, Shanxi Province, China.

Construction has got underway on the new 32,000 m2 Datong Art Museum in Datong, Shanxi province, China. The centrepiece of the structure is a 37 m high Grand Gallery exhibition space, with a span of 80 m, which will be used to display specially commissioned large-scale artworks.

Externally the building, which was designed by Foster + Partners, is sunk into the ground with only the peaks of the roof visible at ground level. The roof will be clad in earth-toned Corten steel and is composed of four interconnected pyramids.

The building is designed to be passively heated and respond to Datong's climate. High-level skylights take advantage of the building's north and north-west orientation, using natural light to minimise solar gain and ensure the optimum environment for the works of art. The roof, which accounts for 70% of the exposed surface area, is will be insulated to twice building code requirements and, with just 10 % glazing, maintenance requirements will also be minimised.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Down and changing: ICm20 crane manufacturer ranking
A decline in 2025 but perhaps smaller than might have been expected
Seven construction technology trends for 2026
Experts say mixed-fleet data, real-time intelligence and autonomous machines will reshape project planning and field execution
Electrifying change
Can there be a pain-free approach to powering the next generation of construction equipment?
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Electrifying change

NEW ARTICLE

Off-Highway Research highlights steady progress in electrification, with market penetration at 0.8% and forecast to more than triple to over 3% by 2028. Nate Keller of Moog shares how hybrid innovation could accelerate this shift in the decade ahead.

Read now