Responsive Image Banner

Benin receives €164 million loan to build stormwater drainage infrastructure

Premium Content
Listen to this article

Skyline of Porto-Novo, Benin Porto-Novo, Benin (Image: pop_gino via AdobeStock - stock.adobe.com)

Benin has received €164 million (US$178.3 million) from the African Development Bank and a fund backed by China to build stormwater drainage infrastructure in four of its cities.

The number of communities at high risk of flooding has risen from 22 in 2010 to 35 in 2022 as a result of climate-change-induced extreme weather events and the disruption of seasonal rainfall patterns, according to the Bank.

The project will develop stormwater drainage infrastructure in the cities of Porto-Novo, Ouidah, Bohicon and Abomey.

It has three components: the first involves stormwater drainage infrastructure and related works, such as the construction of 42.7 km of primary and secondary collectors (large culverts) and 62.3 km of culverts; the asphalting of 18.7 km and the paving of 16.1 km of roads respectively.

It also covers the construction of 72 classrooms, 18 blocks of toilets with 36 hand-washing kits, housing for health workers, four drying sheds for fish smoking, two boreholes equipped with hand pumps, a public square and a public garden.

The plan also involves planting 5,521 seedlings, in addition to the reforestation of 17.22 hectares. Alongside the construction works will be an education programme to prevent gender-based violence, including sexual harassment.

The second component involves setting up a waste management and facility maintenance mechanism (training, equipment, elimination of existing dumps) and strengthening flood-risk warning and management system. A water retention basin and a market gardening area will be created.

The third component covers project management, monitoring and evaluation.

The African Development Bank will put up €118.8 million ($129.2 million) while €45.5 million ($49.5 million) will come from the Africa Growing Together Fund, co-financed by China.

Benin’s government will contribute €13.8 million ($15 million).

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Liebherr LR 1300 comes of age and keeps on going
At 18 how does the 300 tonne capacity LR 1300 lattice boom crawler crane remain so popular?
Global construction equipment sales are still faltering. When will they recover?
Global construction equipment sales should start to come back from the bottom of the cycle next year, according to Off-Highway Research, but there is some uncertainty around the forecast 
Why construction needs to look forward if it wants to handle uncertainty
Dr Alan Manuel, group chief executive of Currie & Brown, on why the global consultant has launched a new Certainty Index
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Inside The Minds of Leaders:
Using Tech To Unearth Greater Profit

FREE WEBINAR ON-DEMAND

This session was hosted by KHL's Mitch Keller, with speakers from AEM, Landmark Construction and Trimble.

Download and watch in your own time