Responsive Image Banner

Balfour Beatty director moves to Costain

Costain, a company specialising in infrastructure solutions, has appointed Alistair Geddes as the director of its rail sector.

Alistair Geddes Alistair Geddes has been newly appointed at Costain (Photo: Costain)

Geddes joins Costain from Balfour Beatty, where he served as operations director for the rail system business. In this position, he managed several manufacturing facilities, frameworks, and projects for clients, including Network Rail, Transport for Wales, Transport for London, and other private sector entities.

He has also held key roles in several major infrastructure programs, such as Crossrail, Hinkley Point C Marine Works, and the Olympic Stadium transformation. 

His appointment follows a successful period of growth for Costain’s transportation division. Recently, the company announced two significant contract awards for HS2, including a £400 million contract for the delivery of tunnel and lineside mechanical and electrical (M&E) systems, as well as a separate contract valued at approximately £300 million to provide high-voltage power supply systems across the entire line, in partnership with the Siemens Mobility and Costain Joint Venture.Siemens Mobility and Costain Joint Venture.

Jonathan Willcock, managing director of transportation at Costain, commented, “UK rail infrastructure is critical for creating a sustainable future and driving UK prosperity through improved productivity, greater connectivity, and job creation.

“But it faces challenges around resilience, particularly with rising demand and more extreme weather. Alistair brings a wealth of experience that will support our rail sector growth as we continue to deliver the strategic needs of our customers.”

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
From combat zones to worksites: a US Marine’s path to construction leadership
Former US Marine Kellen Concepcion on how he went from a military career to heading Semper Fi Rebar, a California subcontractor
Global construction’s carbon footprint to more than double by 2050
The global construction industry’s carbon footprint is set to more than double by 2050
Why telematics could be the most important item in your toolkit
Maximise uptime, productivity and fuel efficiency and you’re halfway to ensuring business success. And there’s a digital tool that can help…
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Why telematics could be the most important item in your toolkit

NEW ARTICLE

Think telematics is just another feature that comes with the machine? Think again. Rokbak’s Graeme Blake explains how the right data can boost uptime, cut fuel costs and transform project performance.

Read now