Responsive Image Banner

More details for US$550 billion infrastructure bill

Premium Content

The legislative text of US President Joe Biden’s US$550 billion infrastructure bill has been unveiled after months of negotiations.

The deal calls for investment of US$110 billion for roads, bridges and major infrastructure projects, US$73 billion in upgrading ageing power infrastructure, US$65 billion in broadband infrastructure for high-speed internet and US$66 billion for rail maintenance and modernisation. 

Also included is US$40 billion for bridge repair, replacement and rehabilitation. The White House says it would be the single, largest dedicated bridge investment since the construction of the interstate highway system, which started in the 1950s.

The deal also contains US$17.5 billion for major projects that would be too large or complex for traditional funding programs.

Last week 17 Republican senators joined Democrats in a 67-32 vote to proceed with the bill’s drafting. Now that the legislative text has been released the bill needs to be finalised and then put to Congress, where it would require at least ten Republican votes.

President Biden said the deal was, “the most significant long-term investment in our infrastructure and competitiveness in nearly a century.” He added that, “This agreement will help ensure that America can compete in the global economy just when we are in a race with China and the rest of the world for the 21st Century.”

The American Society of Civil Engineers (ASCE), which tracks the state of US infrastructure with its report card, called the deal a “once-in-a-generation infrastructure package” that addressed most of the 17 categories criticised in its 2021 report card. The ASCE gave the US an overall mark of C- for the condition of its roads, bridges, ports, drinking water systems and electricity grids and identified a US$2.59 trillion spending gap on its last report card. 

The bill is likely to be worked on all week by Republican and Democratic senators before a vote is taken on it. 

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Liebherr LR 1300 comes of age and keeps on going
At 18 how does the 300 tonne capacity LR 1300 lattice boom crawler crane remain so popular?
Global construction equipment sales are still faltering. When will they recover?
Global construction equipment sales should start to come back from the bottom of the cycle next year, according to Off-Highway Research, but there is some uncertainty around the forecast 
Why construction needs to look forward if it wants to handle uncertainty
Dr Alan Manuel, group chief executive of Currie & Brown, on why the global consultant has launched a new Certainty Index
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
Construction technology survey

Share your views and we’ll give to charity!

Take a quick survey on construction technology and we’ll donate US$3 to Habitat for Humanity for every response.

Take the Survey