Responsive Image Banner

Engineering the ultimate asphalt

KHL Content Studio

Partner Content produced by KHL Content Studio

05 April 2025

Any major road construction project will come with complex challenges, including the management of traffic flow, space limitations, coordinating with utilities, the unpredictability of weather, and more.

Every aspect of the paving chain must be optimised, to ensure efficient and timely delivery of asphalt on the road Every aspect of the paving chain must be optimised, to ensure efficient and timely delivery of asphalt on the road

It’s therefore important to ensure complications arising from paving equipment are removed from the list of issues wherever possible.

From a technical perspective, the variables of asphalt paving mean that keeping things constant can be key to a successful project – and that can mean anything from simple momentum to asphalt temperature, equipment uptime and materials delivery.

Ahead of breaking ground, experienced road construction businesses will aim to simplify operations and processes; placing ever greater reliance on digital technology to do that.

In fact, technology is shifting more from a ‘nice to have’ to a ‘must have’, in a sector struggling to replace the large number of retiring skilled operators.

READ FULL ARTICLE

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA